# Configuring Date and Time Settings (https://jetheads.io/help-center/fundamentals/jettime/administration/configuring-date-and-time-settings/)

Date and time settings in JetTime allow administrators to customize global preferences for time tracking and reporting. These include the first day of the week, how weeks are numbered, and how dates, times, and durations are shown.

<BrowserFrame src="/help-center/images/fundamentals/jettime/administration/configuring-date-and-time-settings/hc-settings-date-and-time.png" alt="Screenshot of the Date and Time settings in JetTime, which set the first day of the week and the duration format of every Jira timesheet." width={2800} height={1400} />

## How to Configure Date and Time Settings [#how-to-configure-date-and-time-settings]

<Steps>
<Step>
### Open Date and Time [!toc] [#open-date-and-time-toc]
From the JetTime app, navigate to **Settings** › **Date and Time** (under **General**).
</Step>
<Step>
### Modify Preferences [!toc] [#modify-preferences-toc]
Adjust the following options:

- **First Day of the Week**. Set your preferred starting day (**Monday** or **Sunday**). Weeks start on this day in calendars, reports, and weekly approval periods.
- **First Week of the Year**. Choose **Week of January 1 (US)** or **Week of January 4 (ISO 8601)**. It decides each week's number and which weeks pair into a bi-weekly period.
- **Date Format**. Choose a date format (for example, `DD/MM/YYYY`, `MM/DD/YYYY`).
- **Time Format**. Select between a 24-hour or 12-hour clock format.
- **Duration Format**. Choose how durations show across JetTime: **Human (3h 45m)**, **Time (3:45)**, **Minutes (225 min)**, **Hours (3.75 h)**, or **Man-Days (0.47 d)**. Every new report and worksheet starts with it, and each can change its own with **Customize**.
</Step>
<Step>
### Save Your Changes [!toc] [#save-your-changes-toc]
Select **Save** to apply them, or **Cancel** to drop them.
</Step>
</Steps>

## Good to Know [#good-to-know]

- Any changes made here apply globally and will impact all users in your Jira instance.
- Changing the **First Day of the Week** or the **First Week of the Year** can move the dates of weekly and bi-weekly [approval periods](/help-center/fundamentals/jettime/work-approvals/period-schemes/), past ones included. JetTime asks you to confirm first: periods whose dates change are hidden and their work logs unlocked, and switching back restores them.
